BuildCare360 is a leading authority in the infrastructure restoration sector, delivering high-performance solutions governed by rigorous Standard Operating Procedures (SOP) and Advanced Technical Procedures (ATP). We bridge the gap between traditional civil work and modern material science.
Our infrastructure protection protocols are applied across critical structural zones to eliminate the root causes of moisture decay and ensure long-term asset value.
UV-resistant coatings designed to manage thermal expansion and monsoon exposure.
Negative and positive side waterproofing to counter underground hydrostatic pressure.
Leak-proof flooring and wall joints for bathrooms and water tanks using high-flexibility membranes.
Anti-carbonation coatings for exterior walls to prevent paint peel and fungal growth.
Specialized waterproofing for swimming pools to withstand constant pressure and chemicals.
Heavy-duty waterproofing for factory floors and drainage systems to resist chemical erosion.
Specialized ATP for earth-facing structures to manage lateral groundwater pressure and soil moisture migration.
High-movement capability seals and SOP-driven mechanical joint treatments to prevent leakage in large-scale structural gaps.
We utilize thermal imaging and electronic moisture meters to map internal dampness before intervention. This **SOP** ensures we treat the hidden source of seepage, not just the visible surface dampness.
Our **ATP** involves the use of hybrid crystalline and nanotechnology-based sealants. These materials penetrate the concrete capillaries to create an integrated, impermeable barrier that survives high hydrostatic pressure.
Standardized execution involves a multi-stage protocol: substrate preparation, coving, primer application, and dual-layer membrane coating. Each layer is inspected for thickness and continuity before the next is applied.
Validation is key. Every horizontal project undergoes a mandatory 48-hour ponding test as per our quality protocol, providing B2B clients with a certified "leak-free" status report upon completion.