BuildCare360 serves as a specialized authority bridging the critical gap between high-voltage electrical systems and major civil infrastructure projects. We handle the complex engineering that powers entire industrial zones and cities.
Utilizing our dual-process approach of Standard Operating Procedures (SOP) and Advanced Technical Procedures (ATP), we manage utility-scale solar farms, high-voltage substation switchyards, and underground utility networks. Our expertise combines heavy earthmoving capabilities with intricate electrical engineering to ensure the seamless delivery of power from the grid to the end-user.
Execution of high-voltage transmission and substation civil works.
| Project Parameter | Building Electrical (Electrical Contractor) | Infrastructure Electrical (Electrical Civil) |
|---|---|---|
| Primary Scope | Indoor wiring, panels, and lighting within walls | Grid networks, transmission lines, and earthworks |
| Core Skills | Troubleshooting controls and telecommunications | Trenching, high-voltage handling, and heavy machinery |
| Typical Projects | Hospitals, retail stores, and manufacturing units | Solar farms, airports, and municipal utilities |
Installing electrical systems for highways and airports, including street lighting, traffic signals, and railway power.
Ensuring 24/7 power for critical services like municipal water treatment plants and sewerage systems.
Civil grading, inverter installation, and grid-connection engineering for utility-scale solar and BESS units.
We deploy ATP diagnostics to identify harness fluctuations and spikes, redesigning room layouts to prevent equipment failure and trip-outs.
Integrating robust OHSMS protocols and arc-flash PPE to manage the inherent risks of high-voltage site work and deep excavations.
Redesigning lighting for optimum consumption and proper intensity across community spaces and industrial zones.
We utilize specialized machinery, including all-terrain pole installers and laser-guided trenchers for surgical site accuracy.
Renewable Energy, solar and BESS units installation.